Practical Post Series 1-20

by Bregs Blog admin team

practical-tools-small-business-social-media

In response to a number of comments to the Blog and queries in our two recent surveys (see posts here and here) we ran a series of twenty Practical Posts, written by and aimed at the home/ business owners, SME’s, and professionals about the new regulations.

Our starting point was extensions, given a large number of comments/ queries we have received relate to questions like “does this minor extension/ alteration qualify under BC(A)R SI.9?“.

Posts cover a multitude of aspects of the new regulations and are a useful place to start if you have any initial queries. Posts are intended to be short and to the point and most headings are dealt with elsewhere in the Blog at greater length. Issues discussed affect end-users such as vitners, offices, employees of larger professional firms and insurance issues, lack of retrospective compliances, off-license and creche fit-out issues, phased completion and contractor issues.

Many new subscribers may not have seen some of these so we have consolidated into one post here for ease of access. Given the range of questions received we will continue this series for another ten posts.

____________

Posts in this series:

Practical Post 1: BC(A)R SI.9 Extensions & Refurbishments– click link here

Practical Post 2: completion- FAO Vintners & Retailers– click link here

Practical posts 3: Change of Use – FDI and offices – Click link here

Practical post 4: What if the builder goes bust?– Click link here

Practical Post 5: Small retail extension- problem with certifier – Click link here

Practical Post 6: no one wants to do certifier roles! – Click link here

Practical Post 7: Existing Shopping Centres – Click link here

Practical Post 8: Employees won’t certify: BC(A)R SI.9 – Click link here

Practical Post 9: Fees & numbers of inspections?: BC(A)R SI.9 – Click link here

Practical Post 10: No retrospective compliance: BC(A)R SI.9 – Click link here

Practical Post 11: Phasing and BC(A)R SI.9? – Click link here

Practical Post 12: “architects only” club?–  Click link here

Practical Post 13: Duties & conflicts- BC(A)R SI.9 –  Click link here

Practical Post 14: Supervision vs Inspection –  Click link here

Practical Post 15: “architects only” club? –  Click link here

Practical Post 16: Pyrite and certification? – Click link here

Practical Post 17: Off-License fit-out –  Click link here

Practical Post 18- material alterations: Creche  – Click link here

Practical Post 19: Phased completion & BC(A)R SI.9 –  Click link here

Practical post 20: Are builders off the hook with BCAR? – click link here

NOTE: This series of posts is not meant to undermine or be in opposition to any professional advice from registered representative bodies: rather it is to offer additional technical aids to those that find themselves having to deal with SI.9 in it’s current form at present. As with all information posted on the Blog we urge all practitioners to check with their respective professional bodies before assuming any roles or duties under Building Control (Amendment) regulation (SI.9 of 2014). We hope this list in one area is useful, so home owners, SME’s and professionals can drop in and click on a particular topic to get summary information that may be useful to them while working within these new and difficult regulations. 

Advertisements